Adjacent to Tomorrow

368-Acre Blank Canvas: Industrial-Zoned Land Directly Adjacent to the First New U.S.–Mexico Commercial Port Built in Three Decades – Douglas,AZ

HISTORIC $765M GOVERNMENT INVESTMENT DRIVES NEW PORT, UTILITY AND HIGHWAY CONSTRUCTION—SIGNALING LONG-TERM INVESTMENT CERTAINTY.

368 Acres – The largest contiguous piece of land

Immediately adjacent to the new port. A rare, large-scale site offering unmatched flexibility for phased development, expansion and long-term value creation.

Location: 2800 Feet to Port / 2600 Feet to Highway 80

Exceptional proximity to the new commercial port and major highway infrastructure (4–5 lanes), enabling fast, efficient, and cost-effective logistics operations.

Full Utilities Along Property Edge – 75-Year Buildout Capacity

Fully serviced infrastructure at the property boundary, engineered to support decades of scalable industrial development with long-term certainty.

Light
Industrial Zoned

Zoned for Light Industrial (LI) use makes it ideal for logistics, manufacturing, technology, and clean energy ventures.

Opportunity
Zone Designation

Significant tax deferral and capital gains advantages that enhance long-term returns for qualified investors.

Foreign Trade
Zone Designation

Potential duty reductions and streamlined customs processes that improve operating efficiency for import- and export-driven businesses.

LARGE, 300 FT WIDE DRAINAGE BASIN BLOCKS WESTWARD ACCESS

This 2-mile basin blocks westward development expansion, making nearby eastern land development opportunities more exclusive.

Robust No-Cost Security
Perimeter from Port

A unique, triple-layer federal security environment providing enhanced protection without additional capital or operating expense.

Flat, Raw Land that
Maximizes Design Flexibility

A level, undeveloped site that maximizes efficiency, site planning flexibility, and build-to-suit potential.

Exceptional Relationships
at County and City Levels

Established local and regional relationships that support streamlined approvals, reduced timelines, and greater development certainty.

Proximity
to Airport

The site's location near Bisbee-Douglas International Airport, about 10 miles northeast of the commercial port, provides air logistics capabilities — ideal for manufacturing and/or transporting time-sensitive goods.

Planned
Rail Hub

Planned rail infrastructure in the area complements the airport and new commercial port— ideal for high-volume shipments.

In my analysis, the subject tract ranks #1 among speculative industrial development opportunities along the entire U.S.–Mexico border.

Jay Hembree, MAI Commercial Appraiser

Arizona’s Easternmost Commercial Port – Faster, Easier Access Due to Recent Highway Overhauls

The Bigger Picture – Why Now?

Supply chain shifts and nearshoring are fueling record industrial demand near secure U.S.–Mexico crossings.

Texas

California

Arizona

New Mexico

Source: Arizona’s trade and competitiveness in the U.S.-Mexico Region, Annual Report 2023. University of Arizona, Eller College of Mgmt.

Arizona's imports from Mexico, growing 105% over 14 years, capitalize on geographical proximity to mexico

Arizona's exports to Mexico,
growing 48% over 14 years

Positioned to become a key hub for Southwestern US and Arizona industrial growth.
Over a Decade (2011-2021): Arizona trade performance with...
Source: Arizona’s trade and competitiveness in the U.S.-Mexico Region, Annual Report 2023. University of Arizona, Eller College of Mgmt.
Recognized for
Strategic Importance
Public statements, independent analysis, and official sources underscore the project’s unique positioning, long-term relevance, and role in one of the most significant border infrastructure investments in decades.
Item #1
CONTACT US for a confidential discussion, due diligence package or site visit.
We welcome qualified inquiries and confidential discussions. Contact our team to request additional information, access detailed materials, or explore potential development and investment opportunities.Lorem ipsum dolor sit amet, consectetur adipiscing elit. Ut elit tellus, luctus nec ullamcorper mattis, pulvinar dapibus leo.
PORT CONSTRUCTION UNDERWAY:

December 2025 aerial photo shows high concentration of earthmovers and permanent fencing already in place. The port project is on track for the scheduled 2028 opening, with Mexico also beginning construction on the south side of the border.

US-MEX Border at James Ranch Rd